We classify every crack before injecting it — structural cracks get epoxy, active leaks get flexible polyurethane, and both get a written scope before we start.

Not every Londonderry, OH foundation crack needs the same material or approach. A vertical settlement crack behaves differently than a stair-step block crack, and we adjust injection technique and material to match what's actually happening in the wall.
Our technicians are trained to tell a cosmetic hairline crack apart from one that signals structural movement, before recommending a fix.
An actively leaking crack rarely waits for a convenient afternoon — we prioritize dispatch for Londonderry, OH cracks that are currently letting water in.
A single crack repair is one of the most predictably priced jobs we do — no surprise scope creep.
We carry both structural epoxy and flexible polyurethane so the crew can match material to the crack on the same visit.

We scope every Foundation Crack Repair job in person before quoting it, since two properties with the same symptom rarely need the same fix.
Structural cracks that aren't actively leaking get epoxy injection, which bonds the concrete back together rather than just sealing the surface.
Polyurethane cures even in the presence of water, which makes it the right call for a crack that's actively letting water through.
Stair-step cracking in block foundation walls needs a different injection port pattern than a vertical crack in poured concrete, and we adjust technique accordingly.
Vertical cracks are usually settlement-related and often isolated; horizontal cracks can indicate hydrostatic pressure pushing on the wall and get flagged for further evaluation.
Fast turnaround matters during a real estate transaction, and we prioritize scheduling for time-sensitive pre-sale repairs.

Tell us the crack's location, whether it's actively leaking, and roughly how wide it is so we can bring the right materials.
A technician measures crack width, checks for wall bowing, and determines whether it's structural, cosmetic, or actively leaking.
We explain why we're recommending one material over the other so the choice isn't a black box.
We check the injection ports after curing to confirm the material fully filled the crack before we consider the job done.

"Crack in our basement wall had been leaking for a year before we finally called. Injection took less than an afternoon and it's been dry since."
— Londonderry Seller
"Polyurethane injection stopped an active leak the same day they showed up — didn't expect it to be that fast."
— Londonderry Homeowner
"Had two cracks — one needed epoxy, one needed polyurethane. They matched material to each one instead of using the same thing on both."
— Londonderry Customer
"Stair-step crack in our block wall had us worried about the whole foundation. Turned out to be isolated and fixable with injection."
— Londonderry Homeowner
Crack classification is separate from water contamination — we assess whether the crack is structural or cosmetic based on width, pattern, and any wall bowing.
Catching a crack early with injection usually costs less than waiting until it's actively leaking.
Epoxy is better for structural bonding on a non-leaking crack; polyurethane is better for a crack that's actively weeping since it cures even with water present.
Most single-crack injections are completed in a few hours during one visit.
A properly injected crack is unlikely to reopen at the same spot, and our work comes with a written warranty covering exactly that.
Turnaround is usually fast enough to fit within a typical closing timeline.
Selling a Londonderry property on a tight timeline? Call +1-866-476-1348 and we'll prioritize scheduling around your closing date.



Zip codes we serve in Londonderry, OH: 45647
Call now for a free inspection and a flat-rate quote before anything gets worse.
Call +1-866-476-1348© SGP Waterproofing. All rights reserved.